We have been working on the back garden for a week now, and things are progressing amazingly.
We arrived back from the
Armistice 1918 ceremony to find Alex well advanced with laying the footings for the retaining wall. After lunch, he and I started work on where exactly the gate posts had to be in order for the gate to close properly. This took longer than you might think, but we did take as much time as was necessary to be totally confident (and then we checked, rechecked, and rechecked again).
Footings for the retaining wall, with the drainpipes
and drainage pipes (almost) in place

We also decided how to hang the gates, as well. The original fitting were for hammering in to stonework, and were no good for concrete posts. Instead, we will be manufacturing the fittings ourselves and bolting them to the posts using
expansive bolts. I made this decision on Thursday (all on my own, I might add) whilst standing in Bricomarché fuming that no-one makes the right fittings for anything I want to do. Hopefully our custom made parts will be an elegant and effective solution.
Yesterday morning Alex arrived with Derek, who was going to be building the retaining wall. The longer wall was quite an involved job, as it is quite a sharp curve - not easy when building with blocks 500mm (18 inches) long.
The straight wall is in, and Derek is getting
to grips with laying the curved wall.

By the end of yesterday both retaining walls were in, and Susan had started work levelling the ground behind them. Our plan is for the garden to be level with the floor of the garage to it's full extent, with a little raised patio in the small alcove at the back. We wont be able to totally backfill behind the walls for a couple of days, nor will be able to hang the gates, but we are now at the stage where we can see what it is meant to be.
The retaining wall finished, with the pipework in place.
Once the concrete is set, the pipes will be cut flush.

This works are temporary in order that we have a level, usable garden whilst stopping all our soil washing away and clogging up the town drains. Ultimately we hope to have the sort of garden boundary common to Preuilly: a rendered wall with
fer forgé (wrought iron) railing on top as can be seen in the background of the second photo.